Off-site fabrication : prefabrication, pre-assembly and modularisation
Main Author: | Gibb , Alistair G.F |
---|---|
Format: | Open Shelf |
Published: |
Caithness, KW:
Whittles Publishing Services,
c1999.
|
Subjects: |
LEADER | 00563pamja2200169 4500 | ||
---|---|---|---|
001 | 0000040217_0004 | ||
005 | 20160118090000.0 | ||
020 | |a 187032577X | ||
020 | |a 9781870325776 | ||
090 | 0 | 0 | |a HD9715.A2 .G532 1999 |
100 | 1 | |a Gibb , Alistair G.F | |
245 | 1 | 0 | |a Off-site fabrication : |b prefabrication, pre-assembly and modularisation |c Alistair G.F.Gibb. |
260 | |a Caithness, KW: |b Whittles Publishing Services, |c c1999. | ||
300 | |a xxii ,262 p.: |b ill.; |c 23cm. | ||
504 | |a Includes Bibliographical and index | ||
650 | 0 | 0 | |a Construction industry |
999 | |a 0000052731 |